Update – clubhouse maintenance programme progressing well

floor works collage

Work is well underway at our clubhouse and we are pleased with the commitment shown by the builder. A detailed list of the work is below. All is going to schedule and, although some external work may continue, we intend to reopen for bridge (as previously advised) on Monday 28 January 2019 - watch this space. We’d like to take this opportunity to thank GLBC member, Stan Pietrowviec for his input during this process.

  • Floor boards have been lifted, the ground has dried out and under-floor drains have been dug.
  • A sump has been put in - this will contain a pump with a float switch to empty at a set level.
  • An exhaust fan will be inserted under the floor (near the cup cupboard) to ensure air flow.
  • Downpipes will be upgraded and a new set of exterior drains will be built - in a rubble drain at the property’s edge alongside the council depot - to move water to the floodwater drainage system at the street.